Biotech

Production plant for microbial additives

UTG supported Lactosan GmbH & Co KG over the entire four-year project duration in the realization of this major project, which was completed on schedule despite the challenges posed by the pandemic.

Metallurgy

Construction of a new copper electrolysis plant

The new copper electrolysis plant was planned for a customer in China. The plant comprised 720 electrolysis cells in 8 groups and 3900 pipes.

553655635
UTG-Anlage-Polyaluminiumchlorid-Eisenchlorid
Chemicals

Production plant for polyaluminium chloride and ferric chloride

An international customer from the chemical industry commissioned UTG with the planning and project management for the construction of a greenfield plant for the production of polyaluminum chloride and ferric chloride in Hungary.

Pharma

New construction of an integrated cell culture fermentation

UTG carried out extensive planning and project management activities for the construction of a new fermentation and processing plant for pharmaceutical cell culture production in Austria.

UTG-Fernwaermeauskopplung-AT
Pulp production

District heating decoupling of a pulp mill

The saturated steam and hot water pipes of a district heating decoupling system in an Austrian pulp mill were planned and statically calculated by UTG.
Saturated steam distributionon pipe bridges: DN 800 – DN 1000, hot water pipes: DN 400, categories 3 and 4 according to DGRL

Pharma

Logistics center for pharmaceuticals production

The multifunctional logistics center at the Vienna site of an international pharmaceutical group was planned and built under the overall project management of UTG. All costs and deadlines were met.

UTG-Aufbereitungsanlage
Metallurgy

Processing plant for metallic secondary raw materials

UTG handled the complete engineering and project management for the new construction of a processing plant for metallic secondary raw materials for an Austrian customer.

Metallurgy

High-temperature pusher furnace

UTG was responsible for the design and construction of a new high-temperature pusher-type furnace system with a maximum temperature of 2,500°C in the USA.

Customers who trust in UTG:

Start your project with us!

Take advantage of our know-how for your demanding industrial projects. Whether you need an initial consultation or detailed planning – our team of experts is at your side with customized solutions. Contact us today and take the first step towards success!

Your contact Guenter Piwetz
is there for you:

T: +43 316 68 27 20-227
E: guenter.piwetz@utg.at

Get in touch now